Enter probe spacing (m) and measured resistance (Ω) for each Wenner test spacing. Two-layer is a simplified engineering estimate, not full curve-matching software — cross-check critical sites against dedicated analysis.
2. Electrode configuration
Primary system: buried grid + rods around the periphery (matches S34 worked example)
Buried perimeter/mesh electrode
Vertical rods spaced around the grid perimeter
Extra tape runs, rings, or foundation/plate electrodes not part of the grid+rods system — combined in parallel (R10). Note this neglects proximity effects.